About Dayavanti Associates

Building the future

Future-ready, intelligent infrastructure. We masterplan, design and digitally coordinate buildings and critical infrastructure across India, London and the GCC.

Home  /  About Us
Who we are
Strategy, digital twin and BIM delivery to improve the way the world works and looks.

BIM (ISO 19650)  |  Digital Twins  |  Masterplans  |  AI

Curved glass tower in the City of London
Our approach

Build right. Operate smart.

We work across the whole asset lifecycle. A project information model (PIM) helps teams build right; an asset information model (AIM) helps owners operate smart. Both live in a controlled common data environment — a single source of truth with secure access.

  • StrategyVision, site context, stakeholder needs, risk, time and cost.
  • DesignCoordinated architecture, structure and MEP in BIM.
  • Delivery4D / 5D planning, clash-free models, construction support.
  • OperationAs-built data, COBie, digital twins and lifecycle value.
Outputs & benefits

What clients gain

Connected information from strategy to renewal delivers measurable value for owners, operators and delivery teams.

01

Cost efficiency

Fewer surprises, clearer budgets and model-driven quantities for cost control.

02

Time savings

Issues resolved in the model, not on site; faster estimates and sequencing.

03

Sustainability

Energy, carbon and resource choices tested before construction.

04

Better decisions

Clearer investment decisions and fewer downstream planning conflicts.

05

Collaboration

Owners, architects, engineers, contractors, regulators and FM teams on one platform.

06

Asset longevity

Verified asset data, predictive maintenance and lifecycle planning.

07

Audit trail

Complete project history with version control and approvals.

08

Standards-based

ISO 19650 and openBIM workflows that protect your information.

Global BIM adoption

A worldwide standard

Public-sector requirements and documented project outcomes show why digital delivery is now expected on major projects.

MarketPublic-sector requirement
United KingdomLevel 2 BIM required for centrally procured public projects from 2016.
SingaporeMandatory BIM e-submission phased from 2013; new projects over 5,000 m² by 2015.
FinlandSenate Properties required IFC-based BIM from 2007; COBIM followed in 2012.
Dubai, UAEDubai Municipality introduced BIM requirements in 2013 and expanded them in 2015.
IndiaThe 2023–24 Economic Survey called for BIM to reduce delays, cost and inefficiency.
IrelandPublic works BIM adoption began in January 2024 under a phased national timeline.

Sources: UK Government; Singapore BCA; buildingSMART Finland; Dubai Municipality; Government of India Economic Survey; Ireland CWMF.

India

Dayavanti Associates

London

Dayavanti Associates

GCC

Dayavanti Associates